add to favorites contact us text version site map









News
10/08/10
«Zorya» - «Mashproekt» intends to move to the dual-fuel engine batch production
09/08/10
Turbines produced by “Zorya”-“Mashproekt” will replace english “Avons”
09/07/10
”Zorya”-“Mashproekt” signed an agreement with the National Academy of Sciences of Ukraine
all news


proh.jpg
7 May 2009 is the 55th anniversary from the USSR Council of Ministers Directive for the South Turbine Plant Construction. The plant was intended for the gas turbine engines experimental and batch production. The main customer was the Soviet Navy. The new branch of industry was created by the best brains of the Soviet Science and technology. Within more than half a century period the enterprise produced and transferred to the customers about 30 models of the main and accelerative gas turbine engines for the naval and merchant vessels. They are installed on board more than 29 percent of the world sea-going ships. The total engines power produced by the enterprise constitutes 33 percent of all the sea-going ship engines summarized power.


2004

Experimental-industrial exploitation of the electric power station equipped with the gas turbine engine UGT 110000 started in the settlement of Kaborga, Nikolaev region, Ukraine.


2003

At Stavishenska gas compressor station, Kyiv region, the first of the kind 16 MW power plant Aquarius with UGT 10000 gas turbine was mounted and launched. Its main peculiarity is vapor inlet in the air-gas channel of the engine. All equipment underwent balancing and commissioning in the 1st/3rd quarter of 2003 and in October 2003 it started working at the gas-main pipeline.
In Byelorussia two co-generative plants ÃÒÝ 25 with UGT 25000 turbine were put into operation at Berezovskaya power station and one more power plant model ÃÒÝ-15Ö with UGT 15000 turbine works at the cement mill in Kostukovichi.
UGT 16000 power plant was sent to Salekhard where it will work using gas or diesel fuel. It is the first in CIS power plant of the kind.
At Ivanovskaya power plant, Russia, UGT 110000 engine started its functioning.
On the base of UGT 15000 a new combined marine gas /diesel engine of 27500 hp was created.
M73 power plant for the merchant hovercraft were forwarded to the customer. It is constructed on the base of two UGT 6000 gas turbine engines of a very special design. They have two power takeoff flanges – from the low pressure compressor and from the power turbine.
M79 power plant having 10000 hp capacity for an hovercraft is now under testing.
For Novgorod power station in Russia a 3.0 MW turbo-expander was delivered.


2002

Acceptance inspection of the ÄÍ70Ë engine was successfully ended. It is a new base turbine UGT 10000 which is included in the updated power plant ÃÏÀ-10ÌÍ70.01.ÎÏ at Kirovogradskaya compressor station, Ukraine. A batch production of the turbine was started.


1990 – 2000

New, specially designed turbines and converted marine power plants of 3, 6, 10, 16, 25 ÌW capacity, with 30-36 % efficiency output were developed for compressing stations construction and modernization.
Block-module co-generation power stations development for electric and heat energy production with 75-85% efficiency output was started.
Steam-and-gas power plants of 16, 25, 35 ÌW capacity with steam injection for capacity enlargement were created. Their efficiency output is 42/45 %.
A unique power plant «Aquarius» (4.2-40 MW capacity, its efficiency output is 35-42%). Steam injection and condensation applied in one-shaft engine for electric generators were developed. They were

             UGT 2500, capacity 2.85 ÌW, efficiency output 28.5% (1993 )
             UGT 110000 110 ÌW, efficiency output 36% (1997).


1995 – 1998

Production of the 4th generation turbines Ì80, ÄÍ-70 with their efficiency output 36-37% was started. During that period single-stage turbine engines ÃÒÄ2500 and ÃÒÄ110 for blocked-scheme generators’ driving gears had being developed.


1985 – 1991

The 4th generation turbine Ì80 (UGT 25000) having 27500 KW capacity and efficiency output 36% was constructed and built.


1971 – 1985

Development and batch production of the 3rd generation Ì70, Ì75, Ì90 turbines of 30-35% efficiency output for gas turbine plants that can be used on board all vessels and ships and for industrial application, batch production of the earlier constructed plants Ì15, Ì16, Ì21, Ì35.


1979

On board the high-speed container ship ATLANTIKA the Ì25 aggregates of COGAS type were mounted. The aggregates could successfully compete with diesel engines. Due to steam turbine contour, the specific consumption was reduced by 25%.


1978

Development of ÄÐ-59 engine for the supercharger drive used in ÃÏÀ-10 gas piping aggregates.


1976

Gas piping aggregates ÃÏÀ-10 of 10000 hp capacity were developed.


1975

Development of the original gas turbine plant M25 with the heat utilization.


1970iås

Gas turbine plants introduction into the national industry:
          floating cogeneration power stations Severnoye Siyaniye equipped with gas turbine generators ÃÒÃ10 (10 ÌW) and ÃÒÃ-12 (12 ÌW), working on diesel fuel and on natural gas;
          gas turbine power trains Mayak, equipped with ÃÒÃ4000 (4 ÌW), and Fakel, equipped with ÃÒÃ12 (12 ÌW);
          stationary power stations with ÃÒÃ20 (18 ÌW) è ÃÒÃ22 (18.5 ÌW).


1969 – 1976

The first converted gas turbines application at the floating cogeneration power stations Severnoye Siyaniye gas turbine power trains Mayak. The first stationary power station construction with ÊÐ-12 engine.


1965 – 1969

The 2nd generation highly economical turbines Ì60, Ì62, Ì8Ê, Ì8Å were developed. Their main features were better acoustic parameters and service life up to 10000 h.
On their base highly economical plants Ì5, Ì7, Ì9, Ì12, Ì21 were constructed and transferred to the batch production. The turbine power plants were installed on the sea-going anti-submarine ships, on the landing craft and guard ships.
Technical parameters of the gas turbines allowed to enlarge distance of navigation. For hovercrafts and air cushion vessels ÄÒ4 è Ì10 main power plants were developed.


1955 – 1964

First generation turbines Ì2, Ä2, Ä3, Ì8 were developed and built.
They were installed on the anti-submarine and guard ships. An original main gas turbine ÌÇ aggregate was constructed and produced in 1958. It was intended for big anti-submarine warships and equipped with 2x36000 hp RV reducer.


1955

The first of the kind Ì1 marine turbine engine was issued to the batch production. It was created on the base of an aircraft turboprop engine developed in the design bureau directed by S. Kolosov.


Ìày 1954

The South Turbine Plant Zorya was placed in operation. The plant was intended for the gas turbine engines experimental and batch production. A design bureau for gas turbine engines and plants constructing was organized.

1949

According to the Soviet Heavy Engineering Minister’s Directive, the South Turbine Plant construction started in Nikolaev. The plant was intended for the steam turbine engines production. The customer was the USSR Navy.