add to favorites contact us text version site map





materials for:

24/02/17 The incoming inspection is improving at Zorya-Mashproekt

The enterprise proceeds with the technical upgrading of industrial laboratories. The cutting site of the laboratory of physical and mechanical tests has been equipped with the LECO’s machines to provide the perfect sampling.

The Zorya-Mashproekt’s laboratory carries out the quality control of incoming casting. The new equipment simplifies the samples preparation and speeds up the study procedure of the wide range of alloys supplied by the different manufacturers.

Nickel-, iron-, copper-, titanium-, and aluminum-base alloys are used for turbine manufacture. The LECO’s products offer the necessary operating modes for examination of a wide variety of casting characteristics.

The laboratory specialists guarantee the high quality of test data therefore it allows us to cooperate fruitfully with the suppliers which quantity is increasing currently due to the implementation of the system of electronic trade.

The LECO (USA) is a global leader in the production of high-technology analytical instrumentation. The LECO’s testing machinery provides the rapid and exact result obtaining. Zorya-Mashproekt has been working with USA’s corporation for more than 15 years.

In 2016, Zorya-Mashproekt invested 115.8 million hryvnias in the advanced facilities. In last year we bought 268 items of equipment, 4 items were upgraded, and 287 items were overhauled.


print send to e-mail
06/06/13 The Ambassador of the Czech Republic in Ukraine: “We will recommend Mykolaiv gas-turbine builders to Czech business world”
17/05/13 SE “Zorya-Mashproject” shipped the next unit for SINOPEC CORPORATION
25/04/13 The State Company “Ukrspecexport” and Chinese Navy visited the State Enterprise “Zorya”-“Mashproject”
19/04/13 Ukraine delivered the first air-cushioned landing craft to China
16/04/13 SE “Zorya”-“Mashproject” will deliver marine power plants to India
10/04/13 A missile boat is launched in Vietnam
27/03/13 The State Enterprise "Zorya"-"Mashproekt" Delivered the Unit for Russian Marine
21/03/13 Zorya-Mashproekt Shipped the Engine for the Vologda Region of Russia
07/03/13 Two Gte-6 Gas Turbine Plants are Put into Operation in China
27/02/13 Zorya-Mashproekt Starts Shipping the Facility for Sinopec
22/02/13 The State Enterprise "Zorya" - "Mashproekt" Delivered the Facility to India
19/02/13 The State Enterprise "Zorya" - "Mashproekt" Delivered the Facility to Yamburg Gas Field
14/02/13 The State Enterprise "Zorya" - "Mashproekt" will Deliver the Equipment to the Republic of Belarus
07/02/13 “Zorya”-“Mashproekt” Modernizes the Electron-Beam Welding Equipment
01/02/13 “Zorya”-“Mashproekt” Conducts the Operations for Vacuum Casting Development
Archive:   1  |  2  |  3  |  4  |  5  |  6  |  7  |  8